Tel/WhatsApp
The difference of single and triple effect evaporator

The difference of single and triple effect evaporator:
For the single effect evaporator:
it is easy to control the density of the glucose syrup, because some people like the high density, sometimes, it can reach 80%-84%
With lower power, and lower output
For the triple effect evaporator:
it can save the steam because of the high steam use ratio
Higher power and higher output
Cost much more than single effect evaporator.
-
Henan Jinrui delivers attieke processing equipment to the customer in Côte d'Ivoire
-
Henan Jinrui Successfully Ships Cassava Flour Processing Line to Madagascar Client
-
Henan Jinrui Advanced Cassava Starch Processing Equipment Wins Over Nigerian Food Processor
-
Henan Jinrui Delivers Custom 1TPD Garri & Attieke Making Equipment to Benin
-
Henan Jinrui Secures Order from Benin for 1-Ton Daily Garri and Attieke Processing Machines
Leave a Message
DOING company offers cassava processing machine from single machine to the complete production line. If you want to get more details about The difference of single and triple effect evaporator , please contact us:
- Do you want to buy machine?
- Yes, I want to buy machine
- No, I want to learn more in advance.
- What is your raw material?
- Cassava
- Potato
- Sweet potato
- Other:
- What is the final product you want to produce?
- Chips
- Flour
- Starch
- What is the final product you want to produce?
- Garri
- Cassava flour
- Cassava starch
- Cassava chips
- Attiekie
- Bammy
- Other:
- What is your planned capacity for final product?
- <1 ton per day
- 1 ton per day
- 2 tons per day
- 3 tons per day
- 3-10 tons per da
- 10-20 tons per day
- >20 tons per day
- What is the usage of your cassava chips?
- Food usage (like fried chips, flour)
- Industrial usage (like animal feeds, ethanol)
- What is your planned capacity for final product?
- <5 ton per hour
- 5-10 tons per hour
- >10 tons per hour
- What is your planned capacity for final product?
- <500 kg per hour
- 0.5-5 ton per hour
- 5-10 ton per hour
- >10 ton per hour
- What is your planned capacity for final product?
- <300 kg per hour
- 300-1000 kg per hour
- 1-5 ton per hour
- 5-10 ton per hour
- >10 ton per hour





