Kaifeng Sida Equipment Co.,Ltd

Henan Doing Mechanical Equipment Co.,Ltd


Researching & Manufacturing the complete set of starch processing machinery and syrup processing machinery.
leave a message

Contact Us

Doing Mechanical Equipment Co.,Ltd

Contact:
Ms Elina
Phone:
+86 155 155 38695
TEL:
+86-371-5677 1822
Skype:
elina881130
Email:
sales@doingmachinery.com
Postcode:
450000
Address:
Yingxie Road,Jinshui District,Zhengzhou, Henan Province, China
Inquiry:
leave a message

Product

Cassava flour processing machine
Syrup processing plant
Starch processing plant
Air-stream crash dryer
Gluten machine

Solutions

Starch production line
Syrup production line
Porduct:
Project:

Corn syrup production equipment

corn syrup production equipment

The old technolgy of corn syrup production equipment is using the corn starch as material, the newest technology  of corn syrup production equipment can use the corn as raw material,no need convert starch firslty, then been corn syrup, can be took of sryup from corns or maize.

Below is process of corn syrup production equipment, and contains all the Corn syrup production equipment during the corn syrup production:

1. Maize/Corn flour making

(1) Maize selection

(2)Remove Germ

(3)Corn/maize flour making

2. Continuous spray liquefaction section

(1).Mixing slurry: Add thermostable amylase and water to flour, and mix them in mixing slurry tank

(2).Spray liquefaction: Heating all tanks by steam, then start Liquid ejectors and pumps. Delivery material continuously and evenly, and control flow by production capacity.

Flash evaporate material in Laminar flow tank, and keep temperature. Observe liquefaction effect.

(3).High temperature treatment: Send passed material to the second Liquid ejector, and keep temperature.

(4).Carry slurry to buffer tank by pump.

3.Filtration section

(1).Filter protein and slag by Plate-and-frame filter press machine.

(2).Carry away protein and slag by Bottom slot for Plate-and-frame filter press machine.

(3).Syrup inflow buffer tanks, then be sent to next step by pump.

4.Saccharification section

Cooling syrup by Heat-exchanger, then send them to Saccharification tank (mixer and coil pipe are set in Saccharification tank. ) by Pumps., then add glucoamylase

5.Decolorization

Carry passed syrup into Decolorization tanks(mixer and coil pipe are set in Saccharification tank.) by pump. Decolor by Activated carbon

6.Filtration section

(1).Filter protein and Activated carbon by Plate-and-frame filter press machine.

(2).Carry away protein by Bottom slot for Plate-and-frame filter press machine

(3).Unclean syrup is sent to big buffer tanks by pump.  

(4).Carry clean syrup into buffer tanks.

7. Ion exchange section

(1).Carry syrup into Ion exchange columns. Resin clean syrup in Ion exchange columns. Then carry clean syrup into buffer tanks.

(2).When Resin loses effect, stop carry syrup into Ion exchange columns, and change another Ion exchange column for work.

(3).Recover Resin: Using heat water to bush resin, then use acid fluid, and alkali fluid to bush Ion exchange columns till Resin has function.

8.Evaporation section

Evaporate syrup by Triple-concentrate of evaporator and Single-concentrate of evaporator. When syrup concentration is OK, shut down steam and stop evaporation. And carry syrup  to Final-product storage tanks by Pumps.